    Cato Group
    Cato Group
    Histor  
    Cato Group
    Cato Construction
    Project Design
    OEM Manufacturing and Fabrication

    Request Information
    Location
    Email
     
    Copyright ? All Rights Reserved Cato Group

    Project Portfolio

    Hauling & Rigging

    (click any image for a larger view)

    Erecting a 40’ wide x 40’ tall field welded section of a 250 ton capacity clay storage bin.
    Erecting a 40’ wide x 40’ tall field welded section of a 250 ton capacity clay storage bin.



    Setting a wet scrubber vessel for a calcine kiln.
    Setting a wet scrubber vessel for a calcine kiln.



    Erecting a 70’ tall single walled exhaust stack.
    Erecting a 70’ tall single walled exhaust stack.



    Setting the upper casing of a baghouse filter.
    Setting the upper casing of a baghouse filter.



    Lifting a venturi reactor for installation in a flue gas scrubber system.
    Lifting a venturi reactor for installation in a flue gas scrubber system.



    Permit over-width and overweight load with our, company owned, 51 ton capacity RGN Trailer.
    Permit over-width and overweight load with our, company owned, 51 ton capacity RGN Trailer.



    Permit over-width, over-length and over-height load with our, company owned, stretch trailers up to 65’ long.
    Permit over-width, over-length and over-height load with our, company owned, stretch trailers up to 65’ long.

    Cato Construction Company I Project Design I OEM Manufacturing and Fabrication
    Home I Employment I
    Contact

    Cato Group 